Loading...
Loading...
Loading...

Ministry of VROMI Announces Partial Road Closure of Parallel Road Rubber Tree Drive, Concrete Resurfacing Project | Government of Sint Maarten

May 12, 2025

Ministry of VROMI Announces Partial Road Closure of Parallel Road Rubber Tree Drive, Concrete Resurfacing Project | Government of Sint Maarten
Loading...

The Ministry of Public Housing, Spatial Planning, Environment and Infrastructure (VROMI) informs the general public of upcoming roadworks in Cole Bay as part of the ongoing Concrete Hard Resurfacing Project.

The project will advance into Section 1, targeting the 90-meter stretch of road parallel to Rubber Tree Drive. The works will involve the concrete paving of the full length, carried out in alternating sections with a road width of 2.5 meters at a time.

Loading...

To facilitate these works, a half-road closure will be implemented for the first half of the 90-meter stretch, during working hours from 7:00 a.m. to 4:00 p.m. on Monday, May 12, 2025, for approximately two (2) weeks. One lane will remain open to allow limited access, and parking will be permitted along the road where space is available.

To minimize disruption, the road will be made fully accessible from 5:00 p.m. to 7:00 a.m. daily. However, residents are advised that use during this time is at their own risk, particularly over freshly paved areas.

The Ministry also notes that temporary inaccessibility to homes may occur during and immediately after the concrete is poured, with exceptions made in case of emergencies.

The Ministry of VROMI apologizes for the inconvenience and thanks the public for their understanding and cooperation as we work to enhance our road infrastructure.

Key Information Recap:

Reason for Closure: Concrete Hard Resurfacing Project road works

Location: Road parallel to Rubber Tree Drive, Cole Bay

Date and Time: Monday, May 12, 2025 for approximately two (2) weeks | 7:00 a.m. – 4:00 p.m.

Parking: Allowed along the road where possible

For more information, please contact the Department of New Works at 542-4292 ext 2388.​

https://www.sintmaartengov.org/news/Pages/Ministry-of-VROMI-Announces-Partial-Road-Closure-of-Parallel-Road-Rubber-Tree-Drive-Concrete-Resurfacing-Project.aspx

Source: https://www.sxm-talks.com/local-news/ministry-of-vromi-announces-partial-road-closure-of-parallel-road-rubber-tree-drive-concrete-resurfacing-project-government-of-sint-maarten/

Loading...

Headlines

Charlotte Brookson Academy closes after student tests positive for COVID | The Daily Herald

September 16, 2026

Charlotte Brookson Academy closes after student tests positive for COVID | The Daily Herald

PHILIPSBURG--Charlotte Brookson Academy for the Performance Arts (CBA) was closed for deep-cleaning on Wednesday after a student tested positive for COVID-19 and other students and teachers reported flu-like symptoms, Education Minister Melissa Gumbs said.  Gumbs said sch...

September 16, 2026

PM: GEBE Plans 6.5 MW of solar as St. Maarten pushes renewable energy transition | The Peoples Tribune

GREAT BAY--Prime Minister Dr. Luc Mercelina on Wednesday placed renewable energy at the center of St. Maarten’s long-term electricity strategy, announcing that NV GEBE is advancing major solar-generation and battery-storage projects aimed at reducing the country’s dependence o...

September 15, 2026

Theo Heyliger discharged from hospital, transferred back to prison | The Peoples Tribune

GREAT BAY--Former Member of Parliament Theo Heyliger has been discharged from the hospital and transferred back to prison, according to an update Tuesday from his wife, Deputy Prime Minister and Minister of Tourism, Economic Affairs, Transport and Telecommunication Grisha Heyl...

Loading...
Loading...
Loading...