The Arrowroot Road sewage project has been finalized for the residents of South Reward. Advanced Drainage System (ADS) pipes were installed on Cucumber Road, Carrot Road, Arrowroot Road, Pear Road and Arrowroot Drive along with 19 sewage pits.
A drainage line was also installed to collect the natural water which frequently flows on Arrowroot Road. The connections all lead to a drain box which continues to the existing trench on L.B. Scott Road. The objective of the project was to alleviate the sewage and groundwater from Arrowroot Road.
Infrastructure Minister Christophe Emmanuel (fourth left) is elated the project has been completed and now area residents will no longer suffer from water running on the road. Esli Construction was the main contractor with D’MYRA
General Maintenance and Construction and W.V. Eyes Survey N.V. as subcontractors. The project was supervised by the Department of Infrastructure Management.
Source: The Daily Herald https://www.thedailyherald.sx/islands/66615-sewage-system
View comments
Hide comments