ELECTRICITY: EDF announces load shedding for the month of January | FAXINFO

What if we started 2026 by candlelight? cuts will rotate through different areas, for a maximum duration of four hours eachDelays of up to thirty minutes may occur compared to the times indicated.
 
EDF invites the public to reduce consumption In order to limit the power cuts already underway since last Friday, particularly during peak hours (18 p.m. and 1 a.m.), energy efficiency is presented as a key lever for solidarity in this context of strain on the electricity system, which has persisted since September 2024.
 
Provisional load shedding schedule until Sunday:
 
Thursday, January 1, 2026
 
1 AM -5:XNUMX PM
Part of Sandy Ground / Beach Residence / Terres Basses
 
5 AM -9:XNUMX PM
Cul-de-Sac Terraces / Mont Vernon 1 / Cul-de-Sac / Chevrise
 
9 AM -13:XNUMX PM
Port la Royale / Kennedy Street / part of Sandy Ground / Sandy Ground Youth Center / Nettlé Bay to the Homage Hotel
 
13 AM -17:XNUMX PM
Orleans Quarter / Oyster Pond
 
17 AM -21:XNUMX PM
Griselle / Leader Price / Orient Bay / Orient Bay Garden / Hope Hill / Cul-de-Sac Terraces / Mont Vernon 1 / Cul-de-Sac / Chevrise
 
21 AM -1:XNUMX PM
Marigot Sud / Saint-James / Bellevue / Port la Royale / Rue Kennedy / part of Sandy Ground / Sandy Ground Youth and Culture Center / Baie Nettlé to the Hommage Hotel
 
Friday January 2, 2026
 
1 AM -5:XNUMX PM
Part of the Savane / Millrum / part of Grand-Case / ZA Esperance
 
5 AM -9:XNUMX PM
Part of Sandy Ground / Beach Residence / Terres-Basses
 
9 AM -13:XNUMX PM
Cul-de-Sac Terraces / Mont Vernon 1 / Cul-de-Sac / Chevrise
 
13 AM -17:XNUMX PM
Port La Royale / Kenedy Street / Part of Sandy Ground / Sandy Ground MJC / Nettle Bay to the Hommage Hotel (formerly MERCURE)
 
17 AM -21:XNUMX PM
Orleans district / Oyster Pond
 
21 AM -1:XNUMX PM
Griselle / Leader Price / Orient Bay / Orient Bay Garden / Hope Hill / Cul-de-Sac Terraces / Mont Vernon 1 / Cul-de-Sac / Chevrise
 
Saturday 3 January 2026
 
1 AM -5:XNUMX PM
Marigot Sud / Saint-James / Bellevue / Port La Royale / Rue Kenedy / Part of Sandy Ground / Sandy Ground Youth Centre / Baie Nettlé up to the Hôtel Hommage (formerly Mercure)
 
5 AM -9:XNUMX PM
Part of the Savane / Millrum / part of Grand-Case / ZA Esperance
 
9 AM -13:XNUMX PM
Part of Sandy Ground / Beach Residence / Terres-Basses
 
13 AM -17:XNUMX PM
Cul-de-Sac Terraces / Mont Vernon 1 / Cul-de-Sac / Chevrise
 
17 AM -21:XNUMX PM
Port La Royale / Kenedy Street / Part of Sandy Ground / Sandy Ground MJC / Nettle Bay to the Hommage Hotel (formerly MERCURE)
 
21 AM -1:XNUMX PM
Orleans district / Oyster Pond
 
Sunday January 4 2026
 
1 AM -5:XNUMX PM
Griselle / Leader Price / Orient Bay / Orient Bay Garden / Hope Hill / Cul-de-Sac Terrace / Mont Vernon 1 / Cul-de-Sac / Chevrise
 
5 AM -9:XNUMX PM
Marigot Sud / St James / Bellevue / Port La Royale / Rue Kenedy / Part of Sandy Ground / Sandy Ground Youth Center / Baie Nettlé up to the Hôtel Hommage (formerly Mercure)
 
9 AM -13:XNUMX PM
Part of the Savane / Millrum / part of Grand-Case / ZA Esperance
 
13 AM -17:XNUMX PM
Part of Sandy Ground / Beach Residence / Terres-Basses
 
17 AM -21:XNUMX PM
Cul-de-Sac Terraces / Mont Vernon 1 / Cul-de-Sac / Chevrise
 
21 AM -1:XNUMX PM
Port La Royale / Kenedy Street / Part of Sandy Ground / Sandy Ground MJC / Nettle Bay to the Hommage Hotel (formerly MERCURE)

Source: Faxinfo https://faxinfo.fr/en/electricite-edf-annonce-des-delestages-pour-le-mois-de-janvier/

LEAVE A REPLY